Sydney Metro West - Eastern Creek Speedway
The Sydney Metro West (SMW) project required a Maintenance and Stabling Facility (MSF) to be constructed at the Valvoline Speedway site at Clyde. With this Speedway being converted to Metro use, the site was relocated to the Eastern Creek Motor Sport Precinct.
This resulted in the NSW Government delivering a world-class speedway within
Western Sydney Parklands. It has been regarded as one of the safest clay speedways in the world and has gained international recognition within racing communities.
Scope :
The CWG team were responsible for the provision of Safety Assurance activities to support the speedway detailed design and demonstrate that the facility was safe (SFAIRP). Our key works included:
- Provision of a Systems and Safety Assurance Plan (SSAP) that articulates the project’s process to achieve a speedway that is designed to standard, fit for purpose and safe to operate
- Assistance with management activities, including workshops, on-site visitation, and verification & validation
- Development of documents (such as SSAP, Preliminary HL, Final HL, Preliminary SAR, and Final SAR) to support safety engineering and assurance activities
- Provision of a Safety Design Statement and Safety Assurance Report that demonstrates and evidences the speedway design is safe and fit for purpose
- Provision of Preliminary SAR and Preliminary hazard log for interim events that were held while the asset wasn’t fully complete
Client : Sydney Metro West/Turnbull Engineering
Services :
- Systems & Safety Assurance
Key people :
- Bayani Benatiro
- James Georgiadis
- Daniel Gallimore
- Tim Jones
- Jeremy Pereira
- Peter Sotirios